Al Safawi Arabia Two Solar
Safawi, Jordan
Location
Size
Operational
Q1 2019

Location
Size
Operational
Q1 2019
The Al Safawi Arabia Two Solar PV Plant, with a capacity of 51 MW, is part of Jordan’s second round Renewable Energy IPP Program. The project, which was awarded as a result of a record-breaking competitive bidding process, is being co-developed in partnership with a leading international solar development firm. Construction on the project is expected to commence by Q1 2018, with the plant scheduled to be operational by Q4 2018. ATC, MASE’s affiliate development entity which will hold the equity stake in the Al Safawi project, is the only developer to be successfully involved in both rounds of Jordan’s Renewable Energy IPP Program, having previously developed the currently operational Arabia One Solar PV Plant as part of the first round. MASE will provide comprehensive asset management and operations & maintenance to the project.
Peak Plant Power | 66.69 MWp |
Annual Production | 144,000 MWh/Year |
Plant Location | Al Safawi, Mafraq, Jordan |
Project Surface Area | 1.7 million m2 |
Technical Information | Single Axis tracking structure
Monocrystalline PV modules Central inverters |
Expected COD | Q4 2018 |
Current Status | Under Development |
Plant Owner | ATC |
MASE Role | O&M |
Project Disclosure Documents | |
Non-Technical Summary | Stakeholder Engagement Plan |